{"id":3388,"date":"2025-10-27T17:24:53","date_gmt":"2025-10-27T20:24:53","guid":{"rendered":"https:\/\/cadbim.com.br\/?post_type=project&#038;p=3388"},"modified":"2025-11-07T14:29:14","modified_gmt":"2025-11-07T17:29:14","slug":"iurd-corporate-bim-implementation","status":"publish","type":"project","link":"https:\/\/cadbim.com.br\/en\/project\/iurd-corporate-bim-implementation\/","title":{"rendered":"IURD \u2013 Corporate BIM Implementation"},"content":{"rendered":"<h2 class=\"wp-block-heading\"><strong>BIM Implementation at IURD: Complete Engineering Structure with Over 7,100 Organized Files<\/strong><\/h2>\n\n\n\n<p>In 2023, the <a href=\"https:\/\/www.universal.org\/\" target=\"_blank\" rel=\"noreferrer noopener\">IURD <\/a>He began his journey towards digital transformation.<\/p>\n\n\n\n<p>With <a href=\"https:\/\/cadbim.com.br\/en\/about-cadbim\/\">technical support from Cadbim<\/a>, The organization implemented BIM institutionally, structuring methodologies, resources, and teams for a new management model in engineering and architecture.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">About the client and the project<\/h2>\n\n\n\n<p>A <strong>IURD (Universal Church of the Kingdom of God)<\/strong> It is one of the largest religious institutions in Brazil and the world, with a vast network of temples, administrative centers, and support units spread throughout the country.<\/p>\n\n\n\n<p>In 2023, it began a process of <strong>Complete modernization of the Engineering and Architecture sector.<\/strong>, with the aim of adopting the <strong>BIM as a corporate methodology<\/strong> Integrating quality, safety, and technology into its projects and works.<\/p>\n\n\n\n<p>To manage this transition, the IURD hired... <strong>Cadbim<\/strong> to lead the <a href=\"https:\/\/cadbim.com.br\/en\/bim-consulting-how-to-choose-the-ideal-partner\/\"><strong>Corporate implementation of BIM<\/strong>,<\/a> ranging from process audits to technical support in pilot projects.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The challenge<\/h2>\n\n\n\n<p>The transition involved a series of <strong>complex challenges typical of large organizations<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Extensive technical collection, with more than <strong>7,100 CAD files, PDFs, and technical documents<\/strong> legacies;<\/li>\n\n\n\n<li>Decentralized and distinct processes between teams;<\/li>\n\n\n\n<li>The need to train professionals with different profiles and technical levels;<\/li>\n\n\n\n<li>Integration between <strong>project, budget, planning and maintenance<\/strong> building.<\/li>\n<\/ul>\n\n\n\n<p>More than modeling, it was necessary <strong>building an institutional BIM culture<\/strong> and ensure <strong>Real adoption in everyday life<\/strong>..<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Cadbim&#039;s role: stages and deliverables<\/h2>\n\n\n\n<p>During <strong>24-month contract<\/strong>, Cadbim executed a strategic and comprehensive implementation, with well-defined stages:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Auditing engineering processes and providing a complete technical diagnosis;<br><\/li>\n\n\n\n<li>Structuring of <strong>BIM infrastructure<\/strong> (platforms, data, flows);<br><\/li>\n\n\n\n<li>Creation of <strong>BIM Mandate (BIM Implementation Plan)<\/strong> institutional;<br><\/li>\n\n\n\n<li>Development of <strong>custom templates and parametric libraries<\/strong>;<br><\/li>\n\n\n\n<li><strong>Theoretical and practical training<\/strong> with application in real-world projects;<br><\/li>\n\n\n\n<li><strong>Assisted operation<\/strong>, with support from Cadbim during the use of BIM;<br><\/li>\n\n\n\n<li>Implementation of dimensions <strong>4D (planning)<\/strong> and <strong>5D (budget)<\/strong>;<br><\/li>\n\n\n\n<li>Presentation of reports, indicators, and business continuity plan.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Technical and strategic results<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reduction of <strong>rework<\/strong> and <strong>reinterpretations<\/strong> in future projects;<br><\/li>\n\n\n\n<li>Increase in <strong>technical predictability<\/strong> in the works;<br><\/li>\n\n\n\n<li>Structuring a <strong>standardized BIM collection<\/strong> and replicable;<br><\/li>\n\n\n\n<li>Internal team <strong>skilled and autonomous<\/strong> in BIM workflows;<br><\/li>\n\n\n\n<li>Ready-to-use base for <strong>retrofits<\/strong>, <strong>building maintenance<\/strong> and <strong>new works.<\/strong><strong><br><\/strong><\/li>\n<\/ul>\n\n\n\n<p>Furthermore, the Universal Church of the Kingdom of God (IURD) has achieved a leap in technological maturity, consolidating BIM as a... <strong>strategic and institutional methodology<\/strong>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">BIM goes beyond modeling.<\/h2>\n\n\n\n<p>The partnership between IURD and Cadbim shows how BIM goes beyond modeling: it&#039;s about... <strong>Change processes, integrate sectors, and create a solid technical foundation.<\/strong> for the sustainable growth of engineering.<\/p>\n\n\n\n<p>With method, clarity, and continuous support, Cadbim delivered <strong>true implementation<\/strong> and not just 3D files.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"535\" src=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-vista-manha-1024x535.webp\" alt=\"\" class=\"wp-image-3389\" title=\"\" srcset=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-vista-manha-1024x535.webp 1024w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-vista-manha-500x261.webp 500w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-vista-manha-768x401.webp 768w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-vista-manha.webp 1408w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">IURD \u2013 Corporate BIM Implementation<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"535\" src=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-por-do-sol-1-1024x535.webp\" alt=\"\" class=\"wp-image-3391\" title=\"\" srcset=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-por-do-sol-1-1024x535.webp 1024w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-por-do-sol-1-500x261.webp 500w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-por-do-sol-1-768x401.webp 768w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2025\/10\/iurd-por-do-sol-1.webp 1408w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>","protected":false},"featured_media":3389,"template":"","project-type":[24],"class_list":["post-3388","project","type-project","status-publish","has-post-thumbnail","hentry","project-type-consultoria-bim"],"acf":[],"_links":{"self":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/project\/3388","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media\/3389"}],"wp:attachment":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media?parent=3388"}],"wp:term":[{"taxonomy":"project-type","embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/project-type?post=3388"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}