{"id":3886,"date":"2026-06-25T09:28:29","date_gmt":"2026-06-25T12:28:29","guid":{"rendered":"https:\/\/cadbim.com.br\/?p=3886"},"modified":"2026-06-29T09:43:01","modified_gmt":"2026-06-29T12:43:01","slug":"bim-for-data-centers","status":"publish","type":"post","link":"https:\/\/cadbim.com.br\/en\/bim-for-data-centers\/","title":{"rendered":"BIM for data centers: the case of DEERNS UK and Cadbim"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Understand how Cadbim supported DEERNS UK in global data center projects, expanding delivery capacity with BIM modeling, multidisciplinary compatibility, and specialized technical support.<\/h2>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/06\/cloud-rack-equipment-room-with-big-data-cyber-internet-content-blue-light-server-interior-modern-communication-storage-hardware-system-hub-1-1024x683.webp\" alt=\"\" class=\"wp-image-3893\" title=\"\" srcset=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/06\/cloud-rack-equipment-room-with-big-data-cyber-internet-content-blue-light-server-interior-modern-communication-storage-hardware-system-hub-1-1024x683.webp 1024w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/06\/cloud-rack-equipment-room-with-big-data-cyber-internet-content-blue-light-server-interior-modern-communication-storage-hardware-system-hub-1-500x333.webp 500w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/06\/cloud-rack-equipment-room-with-big-data-cyber-internet-content-blue-light-server-interior-modern-communication-storage-hardware-system-hub-1-768x512.webp 768w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/06\/cloud-rack-equipment-room-with-big-data-cyber-internet-content-blue-light-server-interior-modern-communication-storage-hardware-system-hub-1-1536x1024.webp 1536w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/06\/cloud-rack-equipment-room-with-big-data-cyber-internet-content-blue-light-server-interior-modern-communication-storage-hardware-system-hub-1-scaled.webp 2048w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/06\/cloud-rack-equipment-room-with-big-data-cyber-internet-content-blue-light-server-interior-modern-communication-storage-hardware-system-hub-1-18x12.webp 18w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The rapid growth of the data center market has increased the demand for increasingly complex, integrated projects developed with shorter delivery cycles.<\/p>\n\n\n\n<p>In this scenario, engineering companies need to balance technical quality, productivity, and operational capacity to meet mission-critical projects in different regions of the world.<\/p>\n\n\n\n<p>It was with this challenge that the <strong>DEERNS UK, <\/strong>A global benchmark in data center engineering., <a href=\"https:\/\/cadbim.com.br\/en\/project\/deerns-brazil\/\">It relied on Cadbim&#039;s support to expand its BIM production capacity.<\/a> and to sustain the growth of its project portfolio in Europe.<\/p>\n\n\n\n<p>The partnership allowed for the expansion of operations without compromising the quality standards required in critical infrastructure projects.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The challenge was to increase delivery capacity without sacrificing quality.<\/strong><\/h3>\n\n\n\n<p>The projects developed by <strong>DEERNS<\/strong> They involve highly complex environments that require coordination between multiple disciplines, a high level of detail, and rigorous review processes.<\/p>\n\n\n\n<p>With the growth in demand, the need arose for a specialized team capable of absorbing part of the production of <a href=\"https:\/\/cadbim.com.br\/en\/4d-5d-bim-modeling-for-data-centers\/\">BIM models<\/a> and to operate in alignment with the company&#039;s global standards.<\/p>\n\n\n\n<p>In addition to technical skills, it was necessary to ensure fluent communication in English, speed in review cycles, and mastery of the tools and processes used in the projects.<\/p>\n\n\n\n<p>The goal was to increase productivity while maintaining the same level of reliability expected by DEERNS engineering.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A team prepared to act as an extension of the operation.<\/strong><\/h3>\n\n\n\n<p>To meet the demand, Cadbim has structured dedicated teams composed of BIM Managers and senior modelers with experience in data center and critical infrastructure projects.<\/p>\n\n\n\n<p>The professionals worked directly on the modeling, coordination, and review of the projects, following the same protocols adopted by the British team.<\/p>\n\n\n\n<p>The operation was organized to offer:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Multidisciplinary BIM modeling;<\/li>\n\n\n\n<li><a href=\"https:\/\/cadbim.com.br\/en\/bim-project-compatibility\/\">Project compatibility;<\/a><\/li>\n\n\n\n<li>Identifying interferences;<\/li>\n\n\n\n<li>Continuous revisions of the models;<\/li>\n\n\n\n<li>Technical communication in English;<\/li>\n\n\n\n<li>Integration into DEERNS workflows.<\/li>\n<\/ul>\n\n\n\n<p>This structure allowed Cadbim to act as an extension of the internal team, contributing to increased production capacity without expanding the organization&#039;s headcount.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>BIM compatibility and interference control in mission-critical projects.<\/strong><\/h3>\n\n\n\n<p><a href=\"https:\/\/cadbim.com.br\/en\/3d-scanning-data-centers\/\">Data centers<\/a> They involve highly specialized systems and require rigorous coordination between disciplines.<\/p>\n\n\n\n<p>For this reason, the early identification of conflicts played a strategic role throughout the projects.<\/p>\n\n\n\n<p>Cadbim conducted detailed analyses of the models, identifying interferences and recording inconsistencies for evaluation by the engineering team.<\/p>\n\n\n\n<p>The work involved:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/cadbim.com.br\/en\/clash-detection-bim\/\">Clash Detection;<\/a><\/li>\n\n\n\n<li>Multidisciplinary compatibility;<\/li>\n\n\n\n<li>Model review;<\/li>\n\n\n\n<li>BIM quality control;<\/li>\n\n\n\n<li>Continuous updating of information.<\/li>\n<\/ul>\n\n\n\n<p>This approach helped to reduce risks, increase the reliability of the models, and improve decision-making during project development.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Featured projects: Vantage Data Center and Global Switch<\/strong><\/h3>\n\n\n\n<p>The partnership between Cadbim and DEERNS UK has been present in important digital infrastructure projects in Europe.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Vantage Data Center \u2013 London<\/h4>\n\n\n\n<p>At Vantage Data Center, Cadbim participated in the multidisciplinary modeling and provided ongoing technical support for the development of BIM models.<\/p>\n\n\n\n<p>The activities involved reconciling disciplines, identifying interferences, and constantly updating the models according to engineering revisions.<\/p>\n\n\n\n<p>The work contributed to maintaining the technical quality and meeting the established deadlines for the project.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Global Switch \u2013 Amsterdam<\/h4>\n\n\n\n<p>In the Global Switch project, Cadbim undertook the modeling of complete disciplines and participated in the compatibility of the systems present in the project.<\/p>\n\n\n\n<p>The models produced served as a basis for technical analyses and strategic decisions related to infrastructure deployment.<\/p>\n\n\n\n<p>The quality of the information contributed to increasing predictability and reducing risks throughout the project.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A partnership that expanded DEERNS&#039; operational capacity.<\/strong><\/h3>\n\n\n\n<p>Throughout the partnership, DEERNS has gained access to a specialized structure capable of simultaneously supporting different highly complex projects.<\/p>\n\n\n\n<p>Among the main results achieved are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Expansion of production capacity;<\/li>\n\n\n\n<li>Reducing rework;<\/li>\n\n\n\n<li>Greater consistency of BIM models;<\/li>\n\n\n\n<li>Agility in review cycles;<\/li>\n\n\n\n<li>Specialized support in data centers;<\/li>\n\n\n\n<li>Efficient integration between international teams.<\/li>\n<\/ul>\n\n\n\n<p>The collaboration allowed DEERNS to expand its operations in global projects without compromising the technical quality of its deliverables.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>BIM for data centers requires experience, integration, and precision.<\/strong><\/h3>\n\n\n\n<p>Mission-critical projects demand a high level of coordination between disciplines, control of information, and structured compatibility processes.<\/p>\n\n\n\n<p>Cadbim&#039;s experience alongside DEERNS demonstrates how specialized teams and well-defined BIM workflows contribute to increased productivity and reduced risks in complex projects.<\/p>\n\n\n\n<p>This is the #JeitoCadbim way of supporting companies that work on projects with high technical demands.<\/p>\n\n\n\n<p>Do you want to structure BIM processes for complex projects and increase your team&#039;s delivery capacity?<\/p>\n\n\n\n<p>Talk to Cadbim.<\/p>","protected":false},"excerpt":{"rendered":"<p>Entenda como a Cadbim apoiou a DEERNS UK em projetos globais de datacenters, ampliando a capacidade de entrega com modelagem BIM, compatibiliza\u00e7\u00e3o multidisciplinar e suporte t\u00e9cnico especializado. O crescimento acelerado do mercado de datacenters tem aumentado a demanda por projetos cada vez mais complexos, integrados e desenvolvidos em ciclos de entrega reduzidos. Nesse cen\u00e1rio, empresas [&hellip;]<\/p>","protected":false},"author":9,"featured_media":3888,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[49,50],"tags":[],"class_list":["post-3886","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bim","category-data-center"],"acf":[],"_links":{"self":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3886","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/comments?post=3886"}],"version-history":[{"count":3,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3886\/revisions"}],"predecessor-version":[{"id":3895,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3886\/revisions\/3895"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media\/3888"}],"wp:attachment":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media?parent=3886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/categories?post=3886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/tags?post=3886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}