{"id":3823,"date":"2026-05-22T11:15:10","date_gmt":"2026-05-22T14:15:10","guid":{"rendered":"https:\/\/cadbim.com.br\/?p=3823"},"modified":"2026-05-22T11:15:10","modified_gmt":"2026-05-22T14:15:10","slug":"bim-diagnosis-what-is-it","status":"publish","type":"post","link":"https:\/\/cadbim.com.br\/en\/bim-diagnosis-what-is-it\/","title":{"rendered":"BIM Diagnosis: What it is, what it assesses, and why you should do it before making any investment."},"content":{"rendered":"<h2 class=\"wp-block-heading\">The BIM Diagnostic assesses people, processes, technology, and management to reveal the true level of maturity of your company and point the way to the most efficient evolution without waste.<\/h2>\n\n\n<figure class=\"wp-block-post-featured-image\"><img decoding=\"async\" width=\"2048\" height=\"1495\" src=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/05\/man-holding-smartphone-with-apartment-buildings-hologram-scaled.webp\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"BIM diagnosis\" style=\"object-fit:cover;\" srcset=\"https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/05\/man-holding-smartphone-with-apartment-buildings-hologram-scaled.webp 2048w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/05\/man-holding-smartphone-with-apartment-buildings-hologram-500x365.webp 500w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/05\/man-holding-smartphone-with-apartment-buildings-hologram-1024x747.webp 1024w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/05\/man-holding-smartphone-with-apartment-buildings-hologram-768x561.webp 768w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/05\/man-holding-smartphone-with-apartment-buildings-hologram-1536x1121.webp 1536w, https:\/\/cadbim.com.br\/wp-content\/uploads\/2026\/05\/man-holding-smartphone-with-apartment-buildings-hologram-16x12.webp 16w\" sizes=\"(max-width: 2048px) 100vw, 2048px\" title=\"\"><\/figure>\n\n\n<p>Investing in BIM without a <strong>BIM diagnostics<\/strong> Prior to the initial assessment, it&#039;s like hiring someone for a construction project without a structural inspection report: the problem doesn&#039;t appear immediately, it only becomes apparent when it costs more to fix.<\/p>\n\n\n\n<p><a href=\"https:\/\/www.digitalconstructionweek.com\/why-construction-projects-still-struggle-with-failure-costs\/\" target=\"_blank\" rel=\"noopener\">According to data from the McKinsey Global Institute, between <strong>11% and 42% of a construction budget<\/strong> It is consumed by rework.<\/a> Much of this waste stems from poorly structured BIM processes, not from a lack of software.<\/p>\n\n\n\n<p>BIM Diagnostics exists to change that.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is BIM Diagnostics?<\/h3>\n\n\n\n<p>O <strong>BIM Diagnosis<\/strong> It is a structured assessment that measures a company&#039;s level of maturity in relation to the BIM methodology.&nbsp;<\/p>\n\n\n\n<p>He doesn&#039;t just check if the team is using modeling software, but analyzes the full set of factors that determine whether BIM is actually generating results within the organization.<\/p>\n\n\n\n<p>According to <a href=\"https:\/\/cadbim.com.br\/en\/digital-maturity-stages-in-the-aec-sector\/\"><strong>National Digital Maturity Survey 2025<\/strong>, Of the 94% companies in Brazil, many are still in the early stages of adopting BIM.<\/a> Most invested in tools. Few invested in processes.<\/p>\n\n\n\n<p>The diagnosis separates these two scenarios and points to the most efficient path for improvement.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is evaluated in a BIM Diagnostic?<\/h3>\n\n\n\n<p>The diagnosis analyzes <strong>four fundamental pillars<\/strong>. Each one reveals a different layer of the company&#039;s BIM maturity and, together, they form a complete picture of what needs to evolve.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">1. People<\/h4>\n\n\n\n<p>It assesses the team&#039;s level of knowledge in BIM, how professionals organize themselves on a daily basis, and the existence of someone responsible for managing the process.<\/p>\n\n\n\n<p>BIM doesn&#039;t work without skilled people with clearly defined roles.&nbsp;<\/p>\n\n\n\n<p>A team that uses the tool without understanding the methodology behind it tends to reproduce the same results, regardless of the software used.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">2. Processes<\/h4>\n\n\n\n<p>It analyzes workflows, the exchange of information between disciplines, and the existence of defined standards for modeling and delivery.<\/p>\n\n\n\n<p>Without a structured process, each project starts from scratch. The mistakes are repeated. <strong>lack of standardization<\/strong> It is one of the main causes of rework in the AEC sector and is rarely visible until the problem has already generated costs.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">3. Technology<\/h4>\n\n\n\n<p>It verifies whether the tools being used are adequate for the company&#039;s needs and whether their potential is being fully utilized. The diagnosis identifies this gap and indicates how to close it.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">4. Information Management<\/h4>\n\n\n\n<p>It assesses how project information is stored, shared, and tracked throughout the entire process, including approval and review workflows.<\/p>\n\n\n\n<p>Decentralized information is one of the biggest generators of rework in the industry. When different teams work with different versions of the project, conflict is only a matter of time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Why conduct a BIM diagnosis before investing more?<\/h3>\n\n\n\n<p>Without a diagnosis, any investment in BIM runs the risk of being misdirected.&nbsp;<\/p>\n\n\n\n<p>The diagnosis breaks this cycle. It identifies where the gaps are, defines priorities, and points the way to the most efficient evolution, respecting the moment and reality of each company.<\/p>\n\n\n\n<p>With the<a href=\"https:\/\/www.gov.br\/mdic\/pt-br\/acesso-a-informacao\/perguntas-frequentes-faq\/secretaria-de-desenvolvimento-industrial-inovacao-comercio-e-servicos\/o-que-e-a-nova\" target=\"_blank\" rel=\"noopener\"> <strong>Decree 11.888\/2024<\/strong><\/a> making BIM mandatory in public works and <strong>New Bidding Law<\/strong> By demanding technical compliance, companies that fail to structure their processes now arrive too late and pay more to adapt.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What are the BIM maturity levels?<\/h3>\n\n\n\n<p>The BIM Diagnostic classifies companies into four levels. Knowing which level your organization falls into is the first step in understanding what needs to change and what is already working.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Level<\/strong><\/td><td><strong>Profile<\/strong><\/td><\/tr><tr><td><strong>Pre-BIM<\/strong><\/td><td>Predominant use of 2D CAD, initial interest in BIM, without a structured process.<\/td><\/tr><tr><td><strong>Low Level<\/strong><\/td><td>Initial steps in adoption, learning curve underway, processes not yet integrated.<\/td><\/tr><tr><td><strong>Intermediate Level<\/strong><\/td><td>BIM applied more broadly, with a focus on optimization and collaboration between teams.<\/td><\/tr><tr><td><strong>High Level<\/strong><\/td><td>BIM integrated into all processes, consolidated culture, data-driven decisions.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Each level has a specific set of recommendations, and that&#039;s exactly what the diagnosis delivers.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How does Cadbim&#039;s BIM Maturity Diagnosis work?<\/h3>\n\n\n\n<p>Cadbim performs the <strong>BIM Maturity Diagnosis<\/strong> Based on 20 objective questions and approximately 15 minutes of assessment.&nbsp;<\/p>\n\n\n\n<p>The result is an honest assessment of the company&#039;s current level, with personalized recommendations for the next step.<\/p>\n\n\n\n<p>It functions as a map of where your company is and a clear path on how to evolve safely, respecting the pace, size, and reality of each organization.<\/p>\n\n\n\n<p>With more than <strong>18 years of experience in BIM consulting.<\/strong>, Cadbim has already helped companies of different sizes and sectors to structure processes, train teams, and achieve results with BIM.<\/p>\n\n\n\n<p><strong>\ud83d\udc49 Access the <\/strong><a href=\"https:\/\/cadbim.com.br\/en\/bim-maturity\/\"><strong>Cadbim BIM Maturity Test<\/strong><\/a><strong> and find out what level your company is at today.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>O Diagn\u00f3stico BIM avalia pessoas, processos, tecnologia e gest\u00e3o para revelar o n\u00edvel real de maturidade da sua empresa e apontar o caminho mais eficiente para evoluir sem desperd\u00edcio. Investir em BIM sem um diagn\u00f3stico BIM pr\u00e9vio \u00e9 como contratar uma obra sem laudo estrutural: o problema n\u00e3o aparece na hora, aparece quando custa mais [&hellip;]<\/p>","protected":false},"author":9,"featured_media":3825,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3823","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sem-categoria"],"acf":[],"_links":{"self":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3823","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/comments?post=3823"}],"version-history":[{"count":1,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3823\/revisions"}],"predecessor-version":[{"id":3826,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3823\/revisions\/3826"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media\/3825"}],"wp:attachment":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media?parent=3823"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/categories?post=3823"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/tags?post=3823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}