{"id":3755,"date":"2026-03-24T12:11:34","date_gmt":"2026-03-24T15:11:34","guid":{"rendered":"https:\/\/cadbim.com.br\/?p=3755"},"modified":"2026-03-25T20:11:37","modified_gmt":"2026-03-25T23:11:37","slug":"how-did-resia-structure-the-large-scale-implementation-of-bim-with-cadbim-support","status":"publish","type":"post","link":"https:\/\/cadbim.com.br\/en\/how-did-resia-structure-the-large-scale-implementation-of-bim-with-cadbim-support\/","title":{"rendered":"How Resia structured the large-scale BIM implementation with support from Cadbim."},"content":{"rendered":"<h2 class=\"wp-block-heading\">The BIM implementation structured by Cadbim helped Resia reduce design cycles, standardize processes, and connect engineering, construction, and industrialization in more than 55 projects.<\/h2>\n\n\n\n<p>In 2018, a project in <strong>Mangonia Village, Florida<\/strong>, This revealed a common problem in complex projects: the blueprints were complete, but they did not represent the spatial reality of the project.<\/p>\n\n\n\n<p>In 2D, everything seemed to work.<\/p>\n\n\n\n<p>But when the disciplines began to be analyzed together, incompatibilities arose between architecture, structure, and building systems that threatened... <strong>project timeline, cost and predictability<\/strong>.<\/p>\n\n\n\n<p>It was in this context that the partnership between began. <strong>Cadbim and Resia (formerly AHS Residential)<\/strong>.<\/p>\n\n\n\n<p>What started as a compatibility project evolved into something much bigger: <strong>BIM implementation as the foundation of the company&#039;s corporate engineering.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Who is Resia?<\/h3>\n\n\n\n<p>A <strong>Resia<\/strong> It is one of the fastest growing companies in the United States in the segment of <strong>multifamily housing<\/strong>, aimed at residential rental developments.<\/p>\n\n\n\n<p>Their business model is highly scalable and based on three pillars:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>speed of development;<\/li>\n\n\n\n<li>standardization of projects;<\/li>\n\n\n\n<li>large-scale repetitive construction.<br><\/li>\n<\/ul>\n\n\n\n<p>This model gained even more traction after... <strong>MRV&amp;CO&#039;s acquisition of AHS<\/strong>, the largest residential construction company in Latin America.<\/p>\n\n\n\n<p>In this context, the company&#039;s competitiveness depends on a constant pipeline of new ventures.<\/p>\n\n\n\n<p>And this requires something fundamental: <strong>Reliable, fast, and predictable design processes.<\/strong><\/p>\n\n\n\n<p>It was precisely in this scenario that the <strong>BIM implementation has become strategic for the business.<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Beginning of BIM implementation: Mangonia Village<\/h3>\n\n\n\n<p>The first project of the partnership was... <strong>Mangonia Village<\/strong>, In 2018, the project already had advanced 2D documentation, but it presented critical coordination problems between disciplines.<\/p>\n\n\n\n<p>Among the main challenges were:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>incompatibilities between architecture, structure and MEP;<\/li>\n\n\n\n<li>lack of standardization between units;<\/li>\n\n\n\n<li>difficulty in extracting reliable quantities;<\/li>\n\n\n\n<li>risk of changes in the field and rework.<\/li>\n<\/ul>\n\n\n\n<p>Cadbim then began to <strong>BIM implementation in the project<\/strong>, structuring the complete 3D modeling of the project.<\/p>\n\n\n\n<p>By transforming the drawings into an integrated digital model, hundreds of interferences that were not visible in the 2D model were identified.<\/p>\n\n\n\n<p>This moment marked the first major impact of the methodology for the Resia team.<\/p>\n\n\n\n<p>With the BIM model:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The inconsistencies were corrected before the work began.;<\/li>\n\n\n\n<li>Decisions began to be made based on integrated visual information;<\/li>\n\n\n\n<li>The predictability of the project has increased significantly.<\/li>\n<\/ul>\n\n\n\n<p>From that point on, BIM implementation ceased to be merely a one-off solution and began to be seen as a strategic path for the company.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">The evolution of BIM implementation in Resia&#039;s projects.<\/h3>\n\n\n\n<p>Following Mangonia Village, Cadbim began to systematically participate in the company&#039;s new developments.<\/p>\n\n\n\n<p>Projects like <strong>Coral Reef, Banyan Ridge, Pine Groves, Tradition, Miami Gardens, Biscayne and Dallas National<\/strong> They began to incorporate the methodology.<\/p>\n\n\n\n<p>In the early years, BIM implementation evolved rapidly.<\/p>\n\n\n\n<p>The projects now include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>structured multidisciplinary coordination;<\/li>\n\n\n\n<li>Standardized documentation templates;<\/li>\n\n\n\n<li>Master lists of components and systems;<\/li>\n\n\n\n<li>Organized project review workflows;<\/li>\n\n\n\n<li>the first <strong>BIM Execution Plan (BEP)<\/strong> company official.<\/li>\n<\/ul>\n\n\n\n<p>Each new venture served as a learning laboratory.<\/p>\n\n\n\n<p>This continuous evolution allowed for the consolidation of a knowledge base that then fueled subsequent projects.<\/p>\n\n\n\n<p>The impact was significant. Projects that previously took about <strong>six months to be consolidated<\/strong> they became structured in approximately <strong>60 days<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">When BIM implementation goes corporate.<\/h3>\n\n\n\n<p>With the company&#039;s rapid growth and the increase in the number of projects, it became clear that BIM needed to go beyond simply coordinating designs.<\/p>\n\n\n\n<p>It was necessary to structure a <strong>Corporate BIM implementation<\/strong>, capable of supporting the company&#039;s expansion.<\/p>\n\n\n\n<p>Cadbim then supported <strong>Creating a complete information management environment.<\/strong><\/p>\n\n\n\n<p>Among the main advances of this phase are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Corporate standardization of 3D modeling;<\/li>\n\n\n\n<li>Integration of construction planning (4D);<\/li>\n\n\n\n<li>Extraction of quantities and costs (5D);<\/li>\n\n\n\n<li>implementation of <strong>Autodesk Construction Cloud (ACC);<\/strong><\/li>\n\n\n\n<li>systematic model audit;<\/li>\n\n\n\n<li>Version control and approval workflows;<\/li>\n\n\n\n<li>Standardized libraries of building components.<br><\/li>\n<\/ul>\n\n\n\n<p>This structure allowed all projects to be centralized in an integrated digital environment, ensuring complete traceability of information.<\/p>\n\n\n\n<p>Resia&#039;s engineering team began operating with <strong>standardized, predictable, and scalable processes<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">From BIM implementation to industrialized construction<\/h3>\n\n\n\n<p>With increasingly structured processes, the company began a new phase in its evolution: <strong>the industrialization of construction<\/strong>.<\/p>\n\n\n\n<p>Among the initiatives in this phase are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>studies on the modularization of units;<\/li>\n\n\n\n<li>development of <strong>Bathroom and kitchen PODs;<\/strong><\/li>\n\n\n\n<li>Establishing our own factories for the production of modules;<\/li>\n\n\n\n<li>Rigid standardization of construction systems.<\/li>\n<\/ul>\n\n\n\n<p>At this point, BIM has ceased to be just a design tool.<\/p>\n\n\n\n<p>It began to function as <strong>The digital platform that connects engineering, supply chain, industrial production, and construction.<\/strong>.<\/p>\n\n\n\n<p>Cadbim directly supported this transition.,<strong> structuring basic models and digital logic <\/strong>necessary to enable the repetitive production of the ventures.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Results of BIM implementation at Resia<\/h3>\n\n\n\n<p>The BIM implementation, built up over the years, has generated concrete results for the company&#039;s operations.<\/p>\n\n\n\n<p>Among the main benefits are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>reducing the project development cycle <strong>from six months to about 60 days;<\/strong><\/li>\n\n\n\n<li>Corporate adoption of BIM across all projects;<\/li>\n\n\n\n<li>significant improvement in the quality of the works;<\/li>\n\n\n\n<li>Reducing rework in the field;<\/li>\n\n\n\n<li>Greater predictability of costs and deadlines;<\/li>\n\n\n\n<li>increased capacity for launching new projects;<\/li>\n\n\n\n<li>Consistent progress towards industrialized construction.<\/li>\n<\/ul>\n\n\n\n<p>Today, the company has already surpassed... <strong>55 projects developed with the support of the BIM methodology.<\/strong>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A transformation built over time.<\/h3>\n\n\n\n<p>The trajectory between Cadbim and Resia shows that the <strong>BIM implementation is an organizational transformation process.<\/strong>, and not just the adoption of a new technology.<\/p>\n\n\n\n<p>Over years of collaborative work, the methodology has become integrated into different areas of the company: engineering, procurement, planning, construction, and industrial production.<\/p>\n\n\n\n<p>Project after project, process after process, BIM has become established as... <strong>one of the pillars of Resia&#039;s growth strategy<\/strong>.<\/p>\n\n\n\n<p>The implementation of BIM helped structure a new way of developing projects, based on reliable information, standardization, and predictability. <a href=\"https:\/\/cadbim.com.br\/en\/contact\/\">Contact us<\/a> Learn more about our BIM consulting and implementation services.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>The BIM implementation structured by Cadbim helped Resia reduce design cycles, standardize processes, and connect engineering, construction, and industrialization in more than 55 projects. In 2018, a project in Mangonia Village, Florida, revealed a common problem in complex projects: the blueprints were complete, but did not represent the spatial reality of the project. [\u2026]<\/p>","protected":false},"author":9,"featured_media":3760,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":""},"categories":[52,50],"tags":[38],"class_list":["post-3755","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cases-cadbim","category-data-center","tag-cadbim"],"acf":[],"_links":{"self":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3755","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/comments?post=3755"}],"version-history":[{"count":3,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3755\/revisions"}],"predecessor-version":[{"id":3761,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/posts\/3755\/revisions\/3761"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media\/3760"}],"wp:attachment":[{"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/media?parent=3755"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/categories?post=3755"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cadbim.com.br\/en\/wp-json\/wp\/v2\/tags?post=3755"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}