The expansion of data centers in Brazil is accelerating, and this changes everything for engineering.
Companies like Scala Data Centers, Odata, Amazon and Microsoft They have been investing billions in digital infrastructure in the country.
But behind every server, fiber optic cable, and redundant system, there's a construction site demanding... maximum efficiency and precision.
And in this new scenario, BIM is no longer a differentiating factor. He became need.
The growth of data centers in Brazil
The digitalization of the world is driving a silent race in the construction sector:
The creation of robust, secure, and strategically distributed data centers.
Brazil already accounts for more than 601,000 tons of Latin America's data center infrastructure. And that share is likely to grow.
Some recent developments:
- A Scala Data Centers invested over R$ 3 billion in new campuses in SP and RJ;
- A Amazon Web Services (AWS) It is expanding its structure in the Southeast region;
- O Northeast and South They are now coming onto the radar with state incentives and energy availability.
All of this requires highly technical work, with tight schedules and zero tolerance for errors.
The technical challenge that doesn't always appear.
Data centers are critical infrastructure projects. That is to say, They cannot fail.
These works involve:
- High-performance HVAC systems (constant climate control);
- Redundant electrical networks with uninterrupted power supply;
- Protection against fire, flooding, and unauthorized access;
- Monitoring and automation of all systems;
- Integration between civil, electrical, mechanical, IT and safety engineering.
It's a surgical procedure.
An unforeseen conflict between pipelines, for example, can generate redesign, delays, and future operational risks.
Where BIM transforms this scenario.
This is where BIM shows its full potential, as it allows to understand, predict, and decide better.
See how it works behind the scenes in a data center:
Clash detection
Anticipating potential interferences between disciplines (HVAC, electrical, cabling, structure).
It avoids rework and ensures a smooth workflow in the project.
BIM 4D and 5D
Integration with the construction schedule and cost simulation. Helps to anticipate bottlenecks and make faster decisions.
Multidisciplinary coordination
Integrated models from various teams on a single platform. Improves communication between designers, construction, and operations.
Digital Twin
Creating a digital model of the asset to facilitate maintenance, upgrades, and management after delivery.
Ideal for data centers that require constant updates and extremely high traceability.
How does Cadbim operate in projects of this scale?
Cadbim specializes in projects with high technical and digital demands.
With over 18 years in the industry, we work with:
- Strategic BIM consulting, from diagnosis to full implantation;
- Reality Capture with high-precision 3D scanning;
- Multidisciplinary modeling with a focus on compatibility and standardization;
- 4D/5D BIM Planning for complete control of deadlines and costs;
- Ongoing technical support, with assisted operation and close support.
Our goal is to ensure that BIM work in practice, Within the realities of the project and its operation, without complicating things. Check out our case studies below.
How Cadbim operates in Data Center projects.
Scala Data Centers – BIM Standardization and Underground Modeling
Cadbim was responsible for structuring BIM standardization across multiple disciplines for Scala, including architecture, electrical, plumbing, HVAC, fire protection, diesel fuel, and special systems.
Challenges:
- Misaligned models;
- Incompatibilities between disciplines;
- Lack of replicable technical basis.
Solutions delivered:
- Standardized templates;
- Underground 3D modeling;
- Replicable processes across sites;
- Less rework and more predictability.
Previously, each project started in a different way. Now, they all follow a structured starting point.
This is the #JeitoCadbim to transform complexity into clarity.
Learn more: https://www.instagram.com/p/DOwDbO3jYzu/?img_index=1
Data center project in partnership with Racional Engenharia.
In this project, Cadbim took on the responsibility of BIM management and coordination of one of the most complex data centers in Brazil. – with 54 models, more than 40 companies involved, and challenging timelines.
Applied solutions:
- Continuous multidisciplinary coordination;
- Integrated 4D planning;
- Power BI dashboards for real-time decision making;
- Technical support in executive modeling;
- Coordination of as built with 3D scanning (LOD 500).
The result was a digital model faithful to the actual building, ready for maintenance, operation, and as an internal benchmark for the client.
Check out the full case study: https://www.instagram.com/p/DNOwK_xvoTS/?img_index=1
Data center construction is one of the most demanding activities in the industry. And, given the scale and complexity involved, BIM is no longer a choice. It's the way forward.
With it, you avoid hidden failures, make data-driven decisions, and deliver critical infrastructure with confidence.
And with the Cadbim By your side, you have a technical partner who understands the complexity and transforms it into control.
Do you want to understand how to apply BIM to projects like this?
Talk to our experts and discover the #JeitoCadbim to structure intelligently.